A former coal mine in Lake Macquarie could become the manufacturing heart of NSW’s next generation of passenger trains, with Teralba named as the preferred site for a major new facility that promises hundreds of jobs and decades of investment in the Hunter.
The NSW Government‘s decision marks a significant milestone in its $12 billion Future Fleet Program, which aims to return passenger train manufacturing to the Hunter and establish a pipeline of work spanning more than 30 years.
The program is expected to support up to 780 jobs during construction and approximately 550 ongoing jobs across the facility and its supply chains, opening new opportunities for local manufacturers, skilled workers and apprentices.
For Lake Macquarie, it also presents the chance to transform former mining land into an advanced manufacturing and employment hub, bringing together industry, suppliers, education and training.
Regional Development Australia (RDA) Hunter CEO Kate O’Mara welcomed the announcement.
“We congratulate Lake Macquarie City Council on the announcement that Teralba has been identified as the preferred site for a Future Fleet train manufacturing facility. This is a significant milestone for Lake Macquarie, the Hunter and the future of advanced manufacturing in New South Wales. It reinforces the Hunter’s reputation as a centre of industrial capability, skilled workforce and manufacturing excellence.”
From mining past to manufacturing future
The proposed facility would be developed on the former Teralba mine site, part of the Macquarie Coal Complex, where plans are already underway to transform former mining land into productive industrial and employment space.
Following a preliminary assessment of two potential locations – Teralba and the Broadmeadow Locomotive Depot – the NSW Government identified Teralba as its preferred site.
Its advantages include existing road and rail connections, proximity to the planned High Speed Rail corridor and sufficient space for train manufacturing, assembly, commissioning and on-site testing, with room for future expansion.
The proposal aligns with the Macquarie Coal Complex Transformation Precinct, being progressed by the NSW Government in partnership with Lake Macquarie City Council and Glencore.
Lake Macquarie Mayor Adam Shultz described the decision as a landmark announcement for the city, highlighting its potential to attract investment, strengthen supply chains and create new career pathways.
Council has advocated strongly for Teralba since the Future Fleet commitment was first announced, working with government and industry to demonstrate the site’s suitability.
Cr Shultz said the opportunity extended well beyond the proposed factory, with the potential to establish an advanced manufacturing precinct supporting local businesses, apprenticeships and vocational training.
A new generation of Hunter-made trains
The Hunter’s rail manufacturing heritage stretches back more than a century. Its factories produced trains that became fixtures of Sydney’s suburban network, including the original Tangara fleet.
Under the Future Fleet Program, the first trains manufactured at the new facility would replace the ageing Tangaras, followed by replacement programs for the Millennium and OSCAR fleets in the 2040s and Waratah trains in the 2050s.
The long-term pipeline is designed to give manufacturers and suppliers greater certainty to invest in equipment, skills and local production capacity.
NSW Premier Chris Minns said the project would restore an industry with deep roots in the Hunter.
“For more than a century, workers in the Hunter proudly built the trains that carried millions of people around Sydney.
“Then those jobs were sent overseas. We’re bringing them back, because we believe NSW should build more of the things we need right here at home.”
Work to strengthen the region’s rail manufacturing workforce is already underway through the Tangara Life Extension Program at Cardiff and in Sydney, employing 100 new qualified workers and 20 apprentices.
What happens next?
While Teralba is the preferred location, the project remains subject to further investigations, planning and land acquisition arrangements.
The NSW Government will continue detailed site investigations and due diligence with Glencore, with construction timeframes and delivery milestones yet to be confirmed. Broadmeadow remains an alternative while this work progresses.
An expression of interest process for manufacturers to design and build the next passenger train fleet is also underway.
For the Hunter, the opportunity extends beyond building trains. The proposed facility could strengthen an established industrial supply chain, attract new businesses and create skilled employment across generations.
And for a region navigating the transition of its traditional industries, the prospect of trains rolling off a production line on former coal mining land is a particularly fitting next chapter.
Pictured: NSW Premier Chris Minns, Lake Macquarie City Council Mayor Adam Shultz, Lake Macquarie City Council CEO David Hughes.
Image: Courtesy Lake Macquarie City Council.

